Course Materials:
Project Planning and Control Using Primavera P6.
Course Outline
INTRODUCTION
1 CREATING A PROJECT PLAN
Level 1 – Planning without resources
Level 2 – Monitoring progress without resources
Level 3 – Scheduling with resources, Roles and Budgets
Level 4 – Monitoring and controlling a resourced schedule.
2 STARTING UP AND NAVIGATION
3 CREATING A NEW PROJECT
4 DEFINING CALENDARS
5 CREATING A PRIMAVERA PROJECT WBS
6 ADDING ACTIVITIES AND ORGANIZING UNDER THE WBS
7 FORMATTING THE DISPLAY
8 ADDING RELATIONSHIPS
9 ACTIVITY NETWORK VIEW
10 CONSTRAINTS
11 FILTERS
12 GROUP, SORT AND LAYOUTS
13 PRINTING AND REPORTS
14 TRACKING PROGRESS
15 USER AND ADMINISTRATION PREFERENCE AND ADVANCED SCHEDULING
OPTIONS
- User preferences
- Admin menu
- Miscellaneous defaults
- Admin preferences
- Scheduling options
16 CREATING ROLES AND RESOURCES
- Understanding Resources
- Creating Roles
- Creating Resources and the Resources Window
- Adding Resources
- Editing Resource Calendars
17 ASSIGNING ROLES, RESOURCES AND EXPENSES
- Understanding Resource Calculations and Terminology
- User Preferences Applicable to Assigning Resources
- Assigning and Removing Roles
- Assigning a Resource to an Activity without a Role
- Removing Resource
17 RESOURCE OPTIMIZATION
- Reviewing resource loading
- Methods of resolving resource peaks and conflicts
- Resource leveling
- Resource leveling function resource shifts
18 USING A RESOURCED SCHEDULE
19 OTHER METHODS OF ORGANIZING PROJECT DATA
20 GLOBAL CHANGE
21 MANAGING THE ENTERPRISE ENVIRONMENT
22 MULTIPLE PROJECT SCHEDULING
23 UTILITIES
24 WHAT IS NEW IN P6 VERSION 7.0
25 WHAT IS NEW IN P6 VERSION 6.0
26 WHAT IS NEW IN P6 VERSION 5.0
PMP ® is the registered marks of the Project Management Institute, Inc.
The PMI ® Registered Education Provider logo is a
registered mark of the Project Management, Inc.